Where can I download the FINALCAD application?
How do I load my project on a tablet?
Carry out a pro project request in order to activate your project (24 to 48 hours)
How do I change my password?
If you don't know your password and you want to change it, just go to manager.finalcad.com (Article: Reset your password).
How do I add an issue?
Check that you are signed in to a user account. Select a floor blueprint then a zone in the list on the left. Click on the "+" in the top right, then position the symbol by dragging and dropping it. After, just choose the company and the issue type.
After reallocations all the comments appear in the reports
All the comments linked to an issue are present in the reports, whether or not they have been reallocated.
However, only the last reallocation is displayed in the reports (last trade/company and issue type).
The best practice in this case, is to put a comment "Cancels and replaces previous comments".
How do I modify the project's library (Trades, companies, issue types)?
Click on the settings menu, then "Library". Click on "Modify" then click on the title you want to change or create a new one (Article: Edit the library).
How do I synchronise my project?
Click on the settings menu, then on "Synchronisation"
See the article "Best practices for synchronising"
How do I send reports to my subcontractors?
Simply transfer the PDF received by email to the subcontractors or copy the PDF link from your email. The subcontractors can also receive reports concerning them by including them on the manager.finalcad.com site. If you are not the administrator, send us a request via email.
Can I change the colours of statuses?
For now, this classification cannot be changed. However, we invite you to send your suggestions to the ideas.finalcad.com site
On a PCV/SC project (Pre-Construction Visit / State of Construction), can I create several "Pre-Construction Visit" forms?
You can, however this is of little use because in the reports you will only have the latest update taken into account.
If you have various "PCV" files, think to assemble them into one form. To do this, write to us at production@finalcad.com
How do I change users?
Click on the photo or the initials of the projet, see the following articles:
How do I change the blueprint order (zones)?
If you are the administrator of your project, simply click on "Modify" in the top right above the zones. If this is not the case, simply send us an email at support@finalcad.com. (Link to access the article: ongoing)
Can I sign in with the same username on several tablets?
Yes it's possible, but we recommend that you create one profile per user for better monitoring.
Comments
0 comments
Please sign in to leave a comment.